Megkerestem a cikket, egy erdekes reszlet:
EnviroMission and SBP estimate the cost of their first 200-megawatt
solar thermal tower at $670m, and say the cost of subsequent towers
would fall. An engineering infrastructure, materials manufacturing
plants and trained workforce would be in place and the design and
construction would have been refined.
The initial cost is comparable with the $600m cost of building a new
200MW brown-coal power station and a drying plant for the coal, which is
nearly 70% water by weight. A 200MW black-coal power station in
Queensland would cost $440m. Davey says these prices ignore the unknown
environmental and health costs of greenhouse gas, sulphur and
particulate emissions from coal-fired power stations.
http://bulletin.ninemsn.com.au/bulletin/eddesk.nsf/0/a7bd712d34ae25b3ca256b12001ba833?OpenDocument&TableRow=1.1.1#1.1.
http://bulletin.ninemsn.com.au/bulletin/eddesk.nsf/0/A7BD712D34AE25B3CA256B12001BA833?open
vajk
Vajk Fekete wrote:
> de ha melle meg 1km szeles is lennel, azert lenne eselyed allva mardni!!!
>
> vajk
>
> pyxys1 wrote:
>
>> Szia,
>>
>> 2004. március 18., 21:01:14, írtad:
>>
>>
>>
>>>> Egy epitesz talalta ki, valami 1km atmeroju, 2-3km magas kemenyt
>>>> epitene, es kore egy par km sugaru foliasatrat.
>>>>
>>>
>> j> Huuu, ez kurvajo gondolat!!! Ezt akar piciben is meg lehet
>> csinalni, ha masert
>> j> nem, kiserleti celbol! Fantasztikus, ahogy ilyen otletek letrejonnek!
>>
>> j> hjozsi
>>
>> de hogy a tökbe építenek egy 3km magas kéményt? én kémény lennék, ilyen
>> magas, biztos elborulnék...
>>
>> --
>> Üdvözlettel,
>> pyxys1 mailto:pyxys1 at westel900.net
>>
>>
>>
>